Mobile CAD Surveying Ltd

  • Increase font size
  • Default font size
  • Decrease font size
Sitemaster Building


SiteMaster Building

E-mail Print

 

Sitemaster BuildingSiteMaster Building Sitemaster Movie- Mobile CAD Software
The mobile solution for Professional Building Surveys and CAD Drawings carried out On Site in Real Time
Draw fast and accurate walls (as single or double line), windows, doors and symbols
rectangular and circular columns, recesses, ,chimneys, ducts, room areas, volumes, perimeters and much more. 

Point ~ Shoot ~ Drawn = Instant Floor Plans

 

SiteMaster Building - for daily use - 100 million square meters of Building Surveys cannot be wrong!

Now being used extensively for Commercial Energy Assessment Floor Plans and Data Collection

How to Insert a Window with Retainer into a Wall
Sitemaster Building Screenshots

176 page Sitemaster Building and Building TS Training Manual for everyone who takes a Training Day with us!
and Point - Shoot - Drawn  Kit bag with every Hardware and Software Bundle purchased! Worth £44.00!

Read more...
 

Sitemaster Building Manual

E-mail Print


 

Sitemaster eManualSitemaster Building and Sitemaster Building TS Training Manual.

176 pages on Sitemaster Building and Sitemaster Building TS, also covers
PowerCAD Sitemaster Office 4

 

 

 

 

 

Read more...
 



Bookmark

Related Items


Newsflash

CMEX-KIT3 - Tramex CMEXpert Kit

£555.00
reduced to  


CMEX-KIT3 - Tramex CMEXpert Kit
CMEX-KIT3 - Tramex CMEXpert Kit

 
 
A pocket size non-destructive digital display moisture meter for measuring percentage moisture content in concrete and comparative readings in other floor screeds. The Concrete Encounter CMEXpert is a digital version of the Tramex Concrete Encounter CME4 hand-held electronic impedance moisture meter. It has 4 scales: Concrete, Gypsum, CM Equivalent and a Reference scale. To carry out moisture tests simply brush any dust from a smooth area of concrete and also from electrodes, switch on the CMEX, press it down on the surface to read the percentage moisture content in the concrete slab. There’s absolutely no surface damage and no waiting.

 

 

 

Read more...